Bif tonnage modelling and assesment
BIF Tonnage Assessment – Lolabe Area, Campo, Southern Cameroon;
Technical note 202510
Click here to Download the Full document Bif tonnage modelling and assesment
Overview
– BIF mineralization in structurally complex terrain. – Ground-magnetic anomaly ~500 Mt to assess. -14 oriented drillholes (~2,000 m) covering 14 % of anomaly. Goal: Validate BIF tonnage, assess band continuity, and
structural control.
Key Data & Findings
i) Drilling Summary Table
AMPG= Amphibolites; BRE=Breccia; IFG=Magnetite
AMPG+Gneiss;Myl=Mylonites; Sap=Saprolite
ii) Tonnage Estimates
iii) Comparison with other Cameroonian deposits:
Recommendations:
Assays and infill orienteddrillingtoconfirm. Petrophysical calibration (mag pen &density).
References
Yin J. et al., 2016. Ore Geology Reviews 2018;
Hyo-Im K. et al., S.S.A.D., et al., 2024 PLOS ONE20(1).

